Annual peak load and load curve
The load curve in the form of the grid feed-in is the sum total of all feed of grid transfer points, power plants, and distribution networks into the maximum voltage network (network area 1) in the control area of TenneT TSO GmbH.
Maximum voltage network load curve
The load curve is the sum of the grid losses and all purchases (own consumption) of the connected converter platforms and wind farms in the grid of the offshore company
Provisional annual peak load
The annual peak load corresponds to the maximum value of the respective load curve in a calendar year. You can see the annual peak load by selecting "this year" in the date range picker. The minimum and maximum values are marked with an arrow in the curve chart.
Annual peak load of the years 2012-2023
2012 | 9 MW 16.12.2012 11:30am |
2013 | 13 MW 15.09.2013 10:45pm |
2014 | 18 MW 10.11.2014 4:45pm |
2015 | 33 MW on 02.09.2015 03:45pm |
2016 | 38 MW on 12.10.2016 4:45pm |
2017 Maximum voltage | 56 MW on 17.10.2017 3:00pm |
2018 Maximum voltage | 55 MW on 22.01.2018 5:30am |
2019 Maximum voltage | 56 MW on 07.02.2019 7:45pm |
2020 Maximum voltage | 55 MW on 28.01.2020 6:00pm |
2021 Maximum voltage | 54 MW on 03.02.2021 09:15am |
2022 Maximum voltage | 55 MW on 25.05.2022 7:45pm |
2023 Maximum voltage | 55 MW on 11.10.2023 7:45am |